Minutes, IBIS Quality Committee 22 April 2014 11:00-12:00 EST (08:00-09:00 PST) ROLL CALL Ericsson: Anders Ekholm Intel: Michael Mirmak Signal Integrity Software * Mike LaBonte Teraspeed Consulting Group: * Bob Ross Everyone in attendance marked by * NOTE: "AR" = Action Required. -----------------------MINUTES --------------------------- Mike LaBonte conducted the meeting. Call for opens and IBIS related patent disclosures: - Mike: We can begin with a bug discussion. AR Review: - Mike send completed spreadsheet to Bob for review. - Spreadsheet is not ready yet. IBISCHK bugs: - Bob showed proposed bug 153. - Bob showed a DOS command window with IBISCHK results. - Bob: We are not supporting the loose 5.0 standard,these are always checked as 5.1. - Mike: Is IBISCHK6 actually checking a 5.0 AMI file for 6.0? - Bob: No it is checked for 5.1 rules. - The E4669 error is included specifically to prove this. - When I change the AMI file to 6.0 that error goes away. - Mike: So the only issue is that IBISCHK6 always prints that it is checking against 6.0. - Will the bug be written against IBISCHK6? - Bob: No, IBISCHK5. - Bob showed AMI files proving that bug 153 is relevant to IBISCHK5. - Mike: We should ask Atul to fix IBISCHK6. AR: Bob revise BUG 153 draft AR: Bob ask Atul to fix AMI check version printing issue Email to ibis-info: - Bob: We should reply privately but also suggest he join the public lists - Mike: I will ask him about subscription IBISCHK messages: - Bob: It would be good to have a sample of the formatted message list to show in the European summit. - Mike: I can have a sample by Friday,or maybe a short example today. - Bob: That would be good. - The same presentation could be given at DAC. - We reviewed potential presentation contents. AR: Mike send draft IBISCHK document pages to Bob - Mike: We could include discussion of IBISCHK6. - Bob: There would not be much to say.. Meeting ended: 12:01 Next meeting Apr 29